Projects

Region
Sector
Service
Results 1 - 10 of 112
Filter By:
Waste to Energy PPP programme, Kuwait
Projects

A Waste to Energy PPP programme located in Kabd area within the State of Kuwait, at a distance of approximately 35 km from Kuwait City. The project has been allocated an area of 500.000 sq. metres for the project, including the sanitary landfills.

Infrata's Role
We provided LTA and commercial services.

Wallonia Street Lighting PPP, Belgium
Projects

Plan Lumière 4.0 which was procured as a PPP contract by the Walloon Regional Infrastructure Supplementary Financing Company (“SOFICO”) and consists of the design, modernisation, financing, management and maintenance of public lighting installations and equipment in the road network of Wallonia (approximately 2,300km). The aim of the Project is to develop a smart, energy efficient lighting system using modern LEDs and dynamic management tools, including upgrade of 100,000 light sources, 70,000 supports and 600 command points, renovation of high and low voltage network and access points, and remote and centralised management.

Infrata's Role
We acted as Lenders Technical Advisor for this project.

VNF Dams, France
Projects

This project includes the replacement of 29 manually operated dams with innovative automatic inflatable water dams on the Aisne and Meuse rivers. The main objectives of this project are to make the operation of these dams safe, to allow efficient management of diversion bays and floods, as well as to maintain navigation, while respecting the environment, in particular through the construction of fish. In order to make the project viable, it includes the construction and operation of hydroelectric turbines.

The duration of the concession is 30 years, with the design and construction phases taking place over a period of eight years from the signing of the partnership contract in 2013. The value of the construction amounts to 260 million d 'euros.

Infrata's Role
The role of our French-speaking team is to provide technical advice to lenders, from the offer phase, in preparation for credit committees, during the financial closing process, throughout the construction phase and, subsequently, during the operation phase.

Troncal del Magdalena 1-2, Colombia
Projects

This project involved two road concessions for a period of 25 years; the Puerto Salgar – Barrancabermeja road, which runs for 259.6km and is broken down into thirteen functional units with two toll plazas, and the Sabana de Torres – Curumani road, which runs for 272.1km and is broken down into 10 functional units with three toll plazas.

Infrata's Role
Infrata worked on behalf of the Sponsor providing both technical and traffic due diligence, assisting the client in the development of the O&M and lifecycle strategy and building a bottom up cost model, as well as toll business plan and revenue forecasts.

Transgabonaise Road Project, Gabon
Projects

The Transgabonaise Road project will see the upgrade of the existing highway between the capital Libreville and Franceville, Gabon’s 3rd city. The works will be broken down into two phases, which will see the rehabilitation and reconstruction of the highway as well as the repair of 4 viaducts and 2 bridges. Construction will also include 3 new toll plazas, a weighing station and operational buildings.

Infrata's Role
We provided Technical, ESG and Traffic advisory services on behalf of the client.

Sydney Metro – Western Sydney Airport. Stations, Systems, Trains, Operations, and Maintenance package (SSTOM), Australia
Projects

This USD $4 Billion project comprises the design, construction, operation and maintenance of the new metro system lining the new Nacy Bird Airport to the exiting Sydney Metro line. The Project comprises 6 new metro stations: street modifications, a Stabling Maintenance Facility and an Operational Control Centre, provision of 12 fully automated revenue vehicles utilizing GoA4 technology, 25 kV AC traction voltage and rail systems, provision of customer services at stations and interchanges, and provision of asset management services, including operations and maintenance of fixed infrastructure, rolling stock and systems.

Infrata's Role
We acted as Lenders’ Technical Advisor to an unsuccessful bidder.

South Niagara Hospital Project, Canada
Projects

The South Niagara Hospital P3 project involves the design, build, finance and maintenance of a 469 inpatient bed hospital and associated services and facilities for a 30-year concession period post construction. The hospital will provide centers of excellence specialising in stroke, complex care, geriatric/psychogeriatrics and wellness in ages, as well as a 24/7 Emergency Department.

Infrata's Role
We provided technical due diligence during bid stage.

Southend Airport, U.K.
Projects

Southend Airport is one of the six London airports. It is located in Essex, England. It served around 2 million passengers in 2019 travelling to VFR and tourism routes flown by LCC airlines.

Infrata's Role
We delivered traffic, technical and business plan advisory for the sponsors.

SKOG, Belgium
Projects

The Project involves the design, financing, construction, and maintenance during a 30-year period of the JanVanEyck Campus for the School Group for Catholic Education Ghent (SKOG). The total area available for the Project is 12,307 m2. The Project aim is to consolidate in one location the educational offer of 5 schools of the SKOG group.

Infrata's Role
Infrata is acting as LTA for this school cluster.

Fitel Fiber, Peru
Projects

The project consists of providing the integral connectivity and social development through the implementation of a fibre optic broadband network for the regions of Junín, Puno, Moquegua and Tacna benefiting 942 rural locations and preferential social interest localities.

Infrata's Role
We provided technical due diligence services on this project.

World map
Africa
Asia
Europe
Latin America
North America
Middle East
Australia & New Zealand
Caribbean